Batch 125229 detail (finished)

Depends on: Batch 125228 (finished) Batch 125227 (finished) Batch 125226 (finished) Batch 125225 (finished) Batch 125224 (finished) Batch 125223 (finished) Batch 125222 (finished)

WARNING!! This page is using JavaScript to filter, sort and delete builds from the table.

Build ID Package Name Package Version Submitted Build Time Status
7241740 R-CRAN-stlnpp 0.3.10-1.copr7241740 2 months ago 3 minutes succeeded
7241745 R-CRAN-CalibrationCurves 2.0.1-1.copr7241745 2 months ago 3 minutes succeeded
7241748 R-CRAN-csmpv 1.0.3-1.copr7241748 2 months ago 3 minutes succeeded
7241742 R-CRAN-rmsb 1.1.0-1.copr7241742 2 months ago 8 minutes failed
7241746 R-CRAN-seqimpute 2.0.0-1.copr7241746 2 months ago 3 minutes succeeded
7241741 R-CRAN-networktools 1.5.2-1.copr7241741 2 months ago 3 minutes succeeded
7241743 R-CRAN-QHScrnomo 3.0.1-1.copr7241743 2 months ago 4 minutes succeeded
7241744 R-CRAN-mdsOpt 0.7.6-1.copr7241744 2 months ago 5 minutes succeeded
7241749 R-CRAN-teal 0.15.2-1.copr7241749 2 months ago 2 minutes succeeded
7241747 R-CRAN-mlexperiments 0.0.3-1.copr7241747 2 months ago 2 minutes succeeded
7241739 R-CRAN-Surrogate 3.2.5-1.copr7241739 2 months ago 2 minutes succeeded
Possible build states importing - Package sources are being imported into Copr DistGit.
pending - Build is waiting in queue for a backend worker.
starting - Backend worker is trying to acquire a builder machine.
running - Build in progress.
succeeded - Successfully built.
forked - Build has been forked from another build.
skipped - This package was skipped, see the reason for each chroot separately.
failed - Build failed. See logs for more details.
canceled - The build has been cancelled manually.
waiting - Task is waiting for something else to finish.