dwmw2/openconnect
Project ID: 25140
Build 5203217 background
General Information
- Status:
- failed - Build failed. See logs for more details.
- Submitted:
- 2023-01-06 01:15 UTC (1 year, 10 months ago)
- Started:
- 2023-01-06 01:17 UTC (1 year, 10 months ago)
- Finished:
- 2023-01-06 01:21 UTC (1 year, 10 months ago)
- Build time:
- 3 minutes
- Build timeout:
- 5 hours
- Networking enabled:
- True
- Directory:
- openconnect
- Built by:
- gitlab.com:dlenski
Source
- Package:
- mingw-openconnect
- Version:
- 9.01.git.129.12e2269-0
- Source Type:
- Build from an SCM repository
- SCM type:
- git
- Clone URL:
- https://gitlab.com/openconnect/openconnect.git
- Committish:
- 12e22692ee3ba1b8eda1e774704995d65c9543b2
- Path to .spec file:
- mingw-openconnect.spec
- Build SRPM with:
- make_srpm
Results
- Source state:
- succeeded
- Source build logs:
- builder-live.log.gz , backend.log.gz
- Built Packages:
- mingw32-openconnect 9.01.git.129.12e2269
- mingw32-openconnect-debuginfo 9.01.git.129.12e2269
- mingw32-openconnect-installer 9.01.git.129.12e2269
- mingw64-openconnect 9.01.git.129.12e2269
- mingw64-openconnect-debuginfo 9.01.git.129.12e2269
- mingw64-openconnect-installer 9.01.git.129.12e2269
Chroot Name | Dist Git Source | Build Time | Logs | State |
---|---|---|---|---|
fedora-36-x86_64 | 297a096 | 3 minutes | builder-live.log.gz , backend.log.gz | failed |
fedora-37-x86_64 | 297a096 | 3 minutes | builder-live.log.gz , backend.log.gz | failed |
fedora-rawhide-x86_64 | 297a096 | 3 minutes | builder-live.log.gz , backend.log.gz | succeeded |