dwmw2/openconnect
Project ID: 25140
Build 5932853 background
General Information
- Status:
- succeeded - Successfully built.
- Submitted:
- 2023-05-18 18:31 UTC (1 year, 6 months ago)
- Started:
- 2023-05-18 18:33 UTC (1 year, 6 months ago)
- Finished:
- 2023-05-18 18:38 UTC (1 year, 6 months ago)
- Build time:
- 5 minutes
- Build timeout:
- 5 hours
- Networking enabled:
- True
- Directory:
- openconnect
- Built by:
- gitlab.com:dwmw2
Source
- Package:
- mingw-openconnect
- Version:
- 9.11.git.6.d1464b9-0
- Source Type:
- Build from an SCM repository
- SCM type:
- git
- Clone URL:
- https://gitlab.com/openconnect/openconnect.git
- Committish:
- d1464b9d13d77d36c4887dad87a6901c8dc2d748
- Path to .spec file:
- mingw-openconnect.spec
- Build SRPM with:
- make_srpm
Results
- Source state:
- succeeded
- Source build logs:
- builder-live.log.gz , backend.log.gz
- Built Packages:
- mingw32-openconnect 9.11.git.6.d1464b9
- mingw32-openconnect-debuginfo 9.11.git.6.d1464b9
- mingw32-openconnect-installer 9.11.git.6.d1464b9
- mingw64-openconnect 9.11.git.6.d1464b9
- mingw64-openconnect-debuginfo 9.11.git.6.d1464b9
- mingw64-openconnect-installer 9.11.git.6.d1464b9
Chroot Name | Dist Git Source | Build Time | Logs | State |
---|---|---|---|---|
fedora-37-x86_64 | 9d9fd5c | 4 minutes | builder-live.log.gz , backend.log.gz | succeeded |
fedora-38-x86_64 | 9d9fd5c | 5 minutes | builder-live.log.gz , backend.log.gz | succeeded |
fedora-rawhide-x86_64 | 9d9fd5c | 5 minutes | builder-live.log.gz , backend.log.gz | succeeded |