dwmw2/openconnect
Project ID: 25140
Build 6131126 background
General Information
- Status:
- succeeded - Successfully built.
- Submitted:
- 2023-06-30 21:22 UTC (1 year, 4 months ago)
- Started:
- 2023-06-30 21:24 UTC (1 year, 4 months ago)
- Finished:
- 2023-06-30 21:32 UTC (1 year, 4 months ago)
- Build time:
- 7 minutes
- Build timeout:
- 5 hours
- Networking enabled:
- True
- Directory:
- openconnect
- Built by:
- gitlab.com:dlenski
Source
- Package:
- mingw-openconnect
- Version:
- 9.12.git.16.2b61f99-0
- Source Type:
- Build from an SCM repository
- SCM type:
- git
- Clone URL:
- https://gitlab.com/openconnect/openconnect.git
- Committish:
- 2b61f99d1e4f04cdc9639aa9d02e25cefc69acc3
- Path to .spec file:
- mingw-openconnect.spec
- Build SRPM with:
- make_srpm
Results
- Source state:
- succeeded
- Source build logs:
- builder-live.log.gz , backend.log.gz
- Built Packages:
- mingw32-openconnect 9.12.git.16.2b61f99
- mingw32-openconnect-debuginfo 9.12.git.16.2b61f99
- mingw32-openconnect-installer 9.12.git.16.2b61f99
- mingw64-openconnect 9.12.git.16.2b61f99
- mingw64-openconnect-debuginfo 9.12.git.16.2b61f99
- mingw64-openconnect-installer 9.12.git.16.2b61f99
Chroot Name | Dist Git Source | Build Time | Logs | State |
---|---|---|---|---|
fedora-37-x86_64 | 23a00d0 | 3 minutes | builder-live.log.gz , backend.log.gz | succeeded |
fedora-38-x86_64 | 23a00d0 | 6 minutes | builder-live.log.gz , backend.log.gz | succeeded |
fedora-rawhide-x86_64 | 23a00d0 | 3 minutes | builder-live.log.gz , backend.log.gz | succeeded |