godas/gluster-ansible

Project ID: 28399

Build Monitor

Package Centos-stream 8 Centos-stream 9 Epel 6 Epel 7 Epel 8 Epel 9
x86_64 x86_64 x86_64 x86_64 x86_64 x86_64
gluster-ansible - - - 1131409
forked
1.0.5-1.fc28
- -
gluster-ansible-cluster 4380173
succeeded
1.0-5.fc33
- 4380173
succeeded
1.0-5.fc33
4380173
succeeded
1.0-5.fc33
4380173
succeeded
1.0-5.fc33
-
gluster-ansible-features 4566413
succeeded
1.0.5-15.fc33
4566413
succeeded
1.0.5-15.fc33
4566413
succeeded
1.0.5-15.fc33
4566413
succeeded
1.0.5-15.fc33
4566413
succeeded
1.0.5-15.fc33
4566413
succeeded
1.0.5-15.fc33
gluster-ansible-infra 6520544
succeeded
1.0.4-23
6520544
succeeded
1.0.4-23
6520544
succeeded
1.0.4-23
6520544
succeeded
1.0.4-23
6520544
succeeded
1.0.4-23
6520544
succeeded
1.0.4-23
gluster-ansible-maintenance 4380174
succeeded
1.0.1-12.fc33
- 4380174
succeeded
1.0.1-12.fc33
4380174
succeeded
1.0.1-12.fc33
4380174
succeeded
1.0.1-12.fc33
-
gluster-ansible-repositories 4380175
succeeded
1.0.1-5.fc33
- 4380175
succeeded
1.0.1-5.fc33
4380175
succeeded
1.0.1-5.fc33
4380175
succeeded
1.0.1-5.fc33
-
gluster-ansible-roles 4566293
succeeded
1.0.5-28.fc33
4566293
succeeded
1.0.5-28.fc33
4566293
succeeded
1.0.5-28.fc33
4566293
succeeded
1.0.5-28.fc33
4566293
succeeded
1.0.5-28.fc33
4566293
succeeded
1.0.5-28.fc33
python-gluster-mgmt-client - - - 1131406
forked
0.2-1
- -
Possible build states importing - Package sources are being imported into Copr DistGit.
pending - Build is waiting in queue for a backend worker.
starting - Backend worker is trying to acquire a builder machine.
running - Build in progress.
succeeded - Successfully built.
forked - Build has been forked from another build.
skipped - This package was skipped, see the reason for each chroot separately.
failed - Build failed. See logs for more details.
canceled - The build has been cancelled manually.
waiting - Task is waiting for something else to finish.