Build Monitor

Warning! This is a large project with many packages and/or builds - we can not hold all the requested data on one page (as we usually do), please use the pagination buttons below the table.

Package Epel 7
ppc64le x86_64
trace-cmd canceled canceled
traceroute canceled canceled
tracker canceled canceled
transfig canceled canceled
tree canceled canceled
trousers canceled canceled
ttmkfdir canceled canceled
tuna canceled canceled
tuned canceled canceled
txw2 canceled canceled
tzdata canceled canceled
ucs-miscfixed-fonts canceled canceled
ucx canceled canceled
udftools canceled canceled
udisks2 canceled canceled
unbound canceled canceled
unicode-ucd canceled canceled
unique3 canceled canceled
unit-api canceled canceled
units canceled canceled
unixODBC canceled canceled
unoconv canceled canceled
unzip canceled canceled
uom-lib canceled canceled
uom-parent canceled canceled
uom-se canceled canceled
uom-systems canceled canceled
upower canceled canceled
uriparser canceled canceled
urlview canceled canceled
urw-base35-fonts canceled canceled
urw-fonts canceled canceled
usbguard canceled canceled
usb_modeswitch canceled canceled
usb_modeswitch-data canceled canceled
usbmuxd canceled canceled
usbredir canceled canceled
usbutils canceled canceled
usermode canceled canceled
ustr canceled canceled
util-linux canceled canceled
uuid canceled canceled
v4l-utils canceled canceled
vala canceled canceled
valgrind canceled canceled
vdo canceled canceled
velocity canceled canceled
vemana2000-fonts canceled canceled
vigra canceled canceled
vim canceled canceled
2551 - 2600 of 2742
of 55
Possible build states importing - Package sources are being imported into Copr DistGit.
pending - Build is waiting in queue for a backend worker.
starting - Backend worker is trying to acquire a builder machine.
running - Build in progress.
succeeded - Successfully built.
forked - Build has been forked from another build.
skipped - This package was skipped, see the reason for each chroot separately.
failed - Build failed. See logs for more details.
canceled - The build has been cancelled manually.
waiting - Task is waiting for something else to finish.