ublue-os/staging

Project ID: 100625

Build 9201102 background

General Information

Status:
failed - Build failed. See logs for more details.
Submitted:
2025-06-23 15:11 UTC (9 days ago)
Started:
2025-06-23 15:13 UTC (8 days ago)
Finished:
2025-06-23 15:20 UTC (8 days ago)
Build time:
7 minutes
Build timeout:
5 hours
Networking enabled:
True
Directory:
staging
Built by:
https://api.github.com/users/p5

Source

Package:
bazaar
Version:
0.0.git.869.ed389bc0.340b77f-1
Source Type:
Build from an SCM repository
SCM type:
git
Clone URL:
https://github.com/ublue-os/packages.git
Committish:
ed389bc08f2e3aaa12653f1be80fcdf8abf85d69
Subdirectory:
staging/bazaar
Path to .spec file:
bazaar.spec
Build SRPM with:
rpkg

Results

Source state:
succeeded
Source build logs:
builder-live.log.gz , backend.log.gz , import.log
Built Packages:
bazaar 0.0.git.869.ed389bc0.340b77f
bazaar-debugsource 0.0.git.869.ed389bc0.340b77f
bazaar-debuginfo 0.0.git.869.ed389bc0.340b77f
Chroot Name Dist Git Source Build Time Logs State Log Detective AI
epel-10-aarch64 bab3566 3 minutes builder-live.log.gz , backend.log.gz failed Ask AI   /   Teach AI
epel-10-x86_64 bab3566 6 minutes builder-live.log.gz , backend.log.gz failed Ask AI   /   Teach AI
fedora-42-aarch64 4e9058a a minute builder-live.log.gz , backend.log.gz succeeded -
fedora-42-x86_64 4e9058a 7 minutes builder-live.log.gz , backend.log.gz succeeded -
fedora-rawhide-aarch64 4e9058a 2 minutes builder-live.log.gz , backend.log.gz succeeded -
fedora-rawhide-x86_64 4e9058a 7 minutes builder-live.log.gz , backend.log.gz succeeded -